Major Finished Projects

S.No. Details of jobs, with the name of the project/SiteClientExecution PeriodNature of WorkTotal Order Quantity Percentage Completion of the job
1CS, SS Piping Work at Tata Motors Pimpdi PuneVoltas Ltd2019-Present Piping & EquipmentPackage100%
2CS Piping Work at IIT Gandhinagar with Voltas LtdVoltas Ltd2018-19 Piping WorkPackage100%
3Strctural Erection Work at JSW Steel Plant, DolviJSW, Towell 2018-2019 Structure500MT100%
4Fabrication & Erection of SS, CS, AS, GI Piping, Structure and Installation of Equipment with Adani at Mundra Solar PV LtdAdani2016-2018Piping, Structure, Equipment 800 Manpower100%
5SS Piping Work with Dr. Kornder Anlagen- und Messtechnik GmbH & Co. KG at MSPVL MundraDr. Kornder Anlagen- und Messtechnik GmbH & Co. KG 2017-2018 Piping Work Package100%
6Chilled water piping work at MSVPL with VoltasVoltas Ltd2017-2018Piping Work Package100%
7Fab & Ere of CS Piping at DAICEC project with Voltas Voltas Ltd2018-2019 Piping Work80 Package100%
8CS, AS, SS AG piping fabrication and erection work at IOCL Haldiya with Punj LloydPunj Lloyd2016-2018 Piping Work Package 100%
9Structural & Piping work for steam superheater at Reliance Jamnagar with Linde EngineeringLinde Engineering 2015-2017Sturcture Works800100%
10Fab&Ere work of Piping, Structure, MIOS at 2*660MW with Adani Power Adani Power 2013-2015 Piping, Structure, Equipment1500100%
11AG & UG- CS, SS piping fabrication & erection work at JBF Petrochemical Ltd Mangalore with PetronPetron Engineering2014-2016 Piping & StructurePackage100%
12AG & UG- CS, SS piping fabrication & erection work at JBF Petrochemical Ltd Mangalore with PetronPetron Engineering 2014-2016 Piping & Structure Package 100%
13Boiler Ducting, Structure, Mill, Fan, at 2*660MW with PetronPetron Engineering2013-2016 Structure, Ducting, Rotary, Static Package 100%
14Boiler structure, Mill, Ducting, at 2*660MW Adani Power Kawai with Petron EngineeringPetron Engineering2012-2014 Structure, PipingPackage 100%
15Turbine AS piping work at 5*660MW Adani Power Tirora with U.B Engg UB Engineering2013-2014 PipingPackage 100%
16Rotary installation work at Maruti Clean coal powerIOT Projects2013-2014 Equipment600MT100%
17Boiler Structure, Ducting, Rotary & Painting work at 5*800MW Tata power Mundra with IOTEP. IOT Projects2010-2012Structure, Piping, Ducting500 Manpower100%
18Scaffolding works at OPAL Dahej with Samsung Engineering Samsung 2011-2012Scaffolding30 Manpower100%
19Boiler & Mill Maintenance Works Sembcorp 2016-2017 Boiler Maintanance25 Manpower100%